NORTH CLIFF BEACH, TENBY
| Client: Pembrokeshire County Council
Engineer: Pembrokeshire County Council
Value: £20,000
The Project
Design & Build project of a cliff palaeo channel that had been mantled with non-engineered fill. Seepage from gravel lenses resulted in softening and failure of the fill and natural clay.
Using roped access operatives, Quantum installed Ischebeck 30/ 16 soil nails to provide support to the cliff face. A gabion mattress drainage detail was constructed reusing site won material providing the client with savings on tipping costs.
|

 |